Projects

Mobile Machine Audit Procedure Development
GTE leveraged their extensive knowledge of mobile machines to review, update and improve a clients set of audit procedures for
Read more.
PLC Upgrade
GTE completed the design, documentation, programming and testing works for the upgrade of two obsolete GE Fanuc 90-70 PLCs to
Read more.
Stockyard Interim Striker System
GTE group were called upon by a client to install a stockyard interim striker system to restrict the movement range
Read more.
Commissioning Support
GTE recently provided one of our clients commissioning support for their operations in Burkina Faso. GTE were instrumental in the
Read more.
Functional Safety Framework
GTE group created a framework to develop and manage safety-related software on Earth Moving Machinery (EMM). The framework was aligned
Read more.
Jaurdi Gold Mine
GTE completed the communications design, drafting of P&IDs, preparation of control philosophy, control systems hardware design and procurement, PLC logic
Read more.
Conveyor Winch Upgrades
One of our clients was having major problems with their conveyor take-up winches across their site which was causing downtime
Read more.
VVVF Replacement Commissioning
GTE group were called upon by a client to commission a replacement medium voltage drive for a conveyor system at
Read more.
PLC Audits
GTE completed a comprehensive audit of a client’s PLC systems at their port and mine operations validating the logic for
Read more.
iba System
GTE engineered, installed and commissioned an iba data acquisition system at one of our clients’ sites. The iba system was
Read more.
Stacker Lubrication Unit PLC Integration
GTE completed the migration of 10 lubrication units across 2 stackers from standalone PLCs to remote I/O integrated to the
Read more.
Operational Support
GTE has provided operational support for one of our major clients for over two and half years. GTE provide a
Read more.
Drawing As-building
GTE is currently working on a project to as-build the electrical drawings for the entire site of a client. The
Read more.
Reeler Remediation
GTE developed a control philosophy and are now in the process of implementing upgrades to the control logic for cable
Read more.
Citect Upgrade
GTE completed a Citect upgrade from Version 5.5 to Version 8 for a client in the food and beverage industry.
Read more.
Protective Device Audits
GTE are conducting the protective device audits on balanced machines for a major client. These audits involve checking the operation
Read more.
Train Load-out Model
GTE developed the automation solution for a 1/18th scale train load out facility.
Read more.